Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| plan [2026/09/08 16:34] – mads4engineering | plan [2026/09/08 16:59] (current) – mads4engineering | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ====== Milestones ====== | ||
| - | |||
| <WRAP round box> | <WRAP round box> | ||
| |< 100% 90px >| | |< 100% 90px >| | ||
| ^ Date ^ Milestone ^ Expected Outputs ^ | ^ Date ^ Milestone ^ Expected Outputs ^ | ||
| - | | 2026-09-18 | Challenge Selection | Top-3 preferred challenges | + | | 2026-09-18 | Challenge Selection | Choose and share your top-3 preferred |
| - | | 2026-09-25 | Business Understanding | Challenge description, | + | | 2026-09-25 | Business Understanding | Challenge description, |
| - | | 2026-10-02 | User Understanding | Personas, user journeys, value proposition, initial requirements | | + | | 2026-10-02 | User Understanding | Personas, user journeys, value proposition |
| - | | 2026-10-09 | Data Understanding | Data inventory, data source assessment, data quality assessment, exploratory analysis | | + | | 2026-10-09 | Data Understanding | Data inventory, data source assessment, data quality assessment |
| - | | 2026-10-16 | Data Preparation | + | | 2026-10-16 | Solution Vision and Data Model | Solution vision, key functionalities, |
| - | | 2026-10-23 | User-Centred Solution Design | + | | 2026-10-23 | UX/UI Prototype |
| - | | 2026-10-30 | Development Planning | System architecture, | + | | 2026-10-30 | Development Planning | System architecture, GitHub repository, Jira board, product backlog, release roadmap |
| - | | 2026-11-04 | Interim Deliverables | Interim | + | | 2026-11-04 | Interim Deliverables | Upload the Interim |
| - | | 2026-11-05 | Interim Presentation | Presentation, | + | | 2026-11-05 | Interim Presentation | Presentation, |
| - | | 2026-11-13 | Interim Report Revision | Refined interim report uploaded | + | | 2026-11-13 | Interim Report Revision | Upload the refined Interim Report (based on feedback) |
| - | | 2026-11-20 | Modelling | Backend data model, data pipeline, analytics components, API specification | | + | | 2026-11-20 | Technical Architecture and Modelling | Backend data model, data processing |
| - | | 2026-11-27 | Integrated Prototype | + | | 2026-11-27 | Minimum Viable Product (MVP) | Functional prototype and demonstration video | |
| - | | 2026-12-04 | Evaluation | User testing, validation | + | | 2026-12-04 | Validation and Evaluation | User testing |
| - | | 2026-12-11 | Final Deliverables | Final report, presentation, poster, video, technical-scientific paper and GitHub repository | + | | 2026-12-11 | Final Deliverables | Upload the Final Report, Presentation, Poster, Video, Technical-Scientific Paper, User Manual |
| - | | 2026-12-17 | Final Presentation | Presentation, demonstration and assessment | | + | | 2026-12-17 | Final Presentation | Final presentation, demonstration and assessment |
| - | | 2026-12-18 | Closing Session | Demonstration of the prototype | + | | 2026-12-18 | Closing Session | Demonstration of the prototype; |
| </ | </ | ||